With over 40 million operating hours and more than 1,200 units shipped, GE’s LM6000 aeroderivative gas turbine has more operating experience than any other aeroderivative gas turbine greater in the +40 MW space. The LM6000 offers greater than 99 percent start and operational reliability and over 98 percent availability. Its 5-minute fast start allows operators to differentiate their dispatch capability while a simple two-spool design results in lower overall maintenance costs. Universal and modular packaging gives the LM6000 a smaller footprint and allows for faster installation and commissioning.
The new LM6000VELOX aeroderivative solution aims to reduce the installation and commissioning schedule of LM6000 turbines by up to 40%, saving up to 4,000 labor hours. This translates to an expected 90 days I&C schedule. Thanks to multiple enhanced modularity features, the LM6000VELOX aeroderivative solution is ushering in a new era of speed in the energy industry.
GE Vernova's LM6000VELOX aeroderivative solution is available:
In both simple- and combined-cycle configurations.
As either a DLE or SAC (water injected) combustor configuration.
For both 50- and 60-Hertz segments.
The LM6000 offers 99%+ start and operational reliability and 98% availability. Its 5-minute fast start allows operators to differentiate their dispatch capability, and its dual-fuel capabilities provides fuel flexibility and helps customers meet emissions limits.
Contact: Hangzhou Gas Turbine Parts Co.Ltd
Phone: 15869109368
Tel: 86-571-89967020
E-mail: saels@gas-turbine-parts.com
Add: No151,ZiDingXiang Road Hangzhou City ZheJiang China 310021