The LMS100 can provide power at part load as efficiently as most gas turbines at full load, and can operate with very little power loss, supporting the grid in times of high demand.Its intercooled gas turbine system provides rapid startup, with an 8-minute start to full load and emergency ramp speeds of up to 500 MW/minute.
The LMS100 can provide power at part load as efficiently as most gas turbines at full load, and can operate with very little power loss, supporting the grid in times of high demand.
Its intercooled gas turbine system provides rapid startup, with an 8-minute start to full load and emergency ramp speeds of up to 500 MW/minute.
Contact: Hangzhou Gas Turbine Parts Co.Ltd
Phone: 15869109368
Tel: 86-571-89967020
E-mail: saels@gas-turbine-parts.com
Add: No151,ZiDingXiang Road Hangzhou City ZheJiang China 310021